We start with a pair of new stamped steel frame rails that are installed in a precision jig to ensure the finished frame is square and true. We then install the tubular center cross member and box the frame with our exclusive boxed truss boxing system in the critical engine bay area. This is a feature not available anywhere else. Made to order. Allow 4-6 weeks.
- New stamped frame rails
- New 1" dropped front crossmember
- Exclusive boxed truss boxing system
- Front panhard bar bracket
- Front four-bar frame bracket
- Front shock mounts
- Tubular crossmember
- 118" wheel base